←Back to overview
Planning · High Needham
Planning applications near High Needham
40 applications in the last 12 months within 5 km. Data aggregated from the local planning authority by planit.org.uk.
Last 30 days
7
Last 12 months
40
Pending
17
Approved
12
PendingApprovedRefusedWithdrawnOtherCentre of High Needham
- PendingConversion of agricultural barns attached to farmhouse to a residential annex, demolition of rear barn and replacement with smaller structure as part of annex.Froghall Farm , Knowsley Hill , Longnor , Staffordshire , SK17 0PWReceived 21 Oct 2026OutlineCON/2026/00802.16 km from centreStaffordshire Moorlands council
- PendingDischarge of conditions 3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 17, 19, 20 and 24 on NP/SM/0925/0958.The Wash House Gauledge Lane LongnorReceived 18 Oct 2026ConditionsNP/DIS/1026/10232.34 km from centrePeak District council
- PendingConversion of agricultural barns attached to farmhouse to a residential annex, demolition of rear barn and replacement with smaller structure as part of annex.Froghall Farm Knowsley Hill LongnorReceived 18 Oct 2026FullNP/SM/1026/10242.7 km from centrePeak District council
- PendingT1- Sycamore- Remove the sycamore to ground level. This is due to a structural engineer deeming the tree to be responsible for cracking of the gable and back wall of the neighbouring Mulberry CottageThe Vicarage, Church Street, Monyash, Bakewell, DE45 1JHReceived 13 Oct 2026TreesNP26/10204.18 km from centrePeak District council
- Unknown1 Sycamore tree to pollard down to 15ft. Tree has sparse canopy and a branch snapped. The damaged branch looked like it could have sooty bark disease.Sycamore Barn Main Street Chelmorton Derbyshire SK17 9SLReceived 11 Oct 2026TreesNP26/09964.64 km from centrePeak District council
- PendingErection of an incidental domestic buildingBoothlow Hayes Farm Knowsley Hill LongnorReceived 06 Oct 2026FullNP/SM/0926/09601.7 km from centrePeak District council
- PendingErection of an incidental domestic buildingBoothlow Hayes Farm , Knowsley Hill , Longnor , Staffordshire , SK17 0PWReceived 06 Oct 2026OutlineCON/2026/00742.16 km from centreStaffordshire Moorlands council
- PendingNew workshop/storesBRIERLOW QUARRY , Brierlow Bar , Buxton , Derbyshire , SK17 0ELReceived 23 Sept 2026OutlineCON/2026/00874.44 km from centreHigh Peak council
- UnknownT1 (Birch Tree) to prune lateral branches giving a clearance of 2m from the house roof as there is an overhang; they could potentially cause damage to roof tiles. T2 (Climbing Honysuckle) remove to ground level. The client would like this removed so they can perform maintenance on the side of the house. At the moment any pointing or repair can not be carried out T3 (Climbing Hydrangea) remove to ground level. The client would like this removed so they can perform maintenance on the side of the house. At the moment any pointing or repair can not be carried outFox Torr Cottage,Chapel Street,Monyash,Derbyshire,DE45 1JJReceived 23 Sept 2026TreesNP26/09364.15 km from centrePeak District council
- PendingT4 Common Lime Reasons for proposed works : Unable to fully inspect due to basal and stem epicormic growth. Proposed works : Remove basal and stem epicormic to crown break (4m) to aid inspection. T6 Common Lime Reasons for proposed works : Unable to fully inspect due to basal and stem epicormic growth. Proposed works : Remove basal and stem epicormic to (3m) to aid inspection. T12 Apple Reasons for proposed works : Crown encroaching onto the adjacent building. Proposed works : Reduce the height of the crown to 2.5mLongnor Vicarage, Gauledge Lane, Longnor, SK17 0PAReceived 20 Sept 2026TreesNP26/09252.38 km from centrePeak District council
- PendingProposed link extension.1 Moos Barn Main Road FlaggReceived 09 Sept 2026FullNP/DDD/0926/08964.54 km from centrePeak District council
- PendingConsultation from PDNP - Application Number: NP/SM/0826/0842 Location: Fawside Farm, Longnor, Proposal: Change of use of dwellinghouse and outbuildings to sui generis use, residential recording studio with temporary accommodation and ancillary facilities, with associated operational works.Fawside Farm , Edge Top Road , Hollinsclough , Staffordshire , SK17 0RAReceived 09 Sept 2026OutlineCON/2026/00673.4 km from centreStaffordshire Moorlands council
- PendingDischarge of conditions 3, 10, 11, 12, 14, 15, 16, 17 & 18 on NP/SM/0125/0052.Hall Hill Fawfield Head LongnorReceived 08 Sept 2026ConditionsNP/DIS/0926/08844.52 km from centrePeak District council
- RefusedChange of use of dwellinghouse and outbuildings to sui generis use, residential recording studio with temporary accommodation and ancillary facilities, with associated operational works.Fawside Farm LongnorReceived 07 Sept 2026Decided 12 Oct 2026FullNP/SM/0826/08423.4 km from centrePeak District council
- PendingResubmission of withdrawn retrospective application (HPK/2026/0084) for a new access onto the main road (A515) and construction of a new track off the existing track to the existing bungalowGreat Low Farm , Unnamed Road Section Of A515 From Brierlow Bar To District Boundary , Flagg , Derbyshire , SK17 9QEReceived 27 Aug 2026FullHPK/2026/03472.57 km from centreHigh Peak council
- RefusedDemolition of existing outbuildings to be replaced by one singular outbuildingHill View 3 Hill View FlaggReceived 19 Aug 2026Decided 12 Oct 2026FullNP/DDD/0726/07213.98 km from centrePeak District council
- UnknownLeylandii T1-4 - Fell, outgrown location, close to utility lines Sycamore T5 - Crown lift by removal of two lowest limbs growing westward2 Wallpits Cottage Wallpit Lane Hartington SK17 0AEReceived 19 Aug 2026TreesNP/TCA/0826/08224.75 km from centrePeak District council
- ApprovedAgricultural building to house cattle, cubicle building for dairy cows.Highfield Farm FlaggReceived 18 Aug 2026Decided 28 Oct 2026FullNP/DDD/0726/07324.25 km from centrePeak District council
- PendingSubject: Submission of 5-Yearly Report on Landscaping, Restoration and Aftercare Works pursuant to Condition 33 of Planning Permission Ref. NP/HPK/0403/038Lafarge Cement Hope Works HopeReceived 18 Aug 2026ConditionsNP/DIS/0826/08152.7 km from centrePeak District council
- PendingSubject: Submission of 5-Yearly Report on Landscaping, Restoration and Aftercare Works pursuant to Condition 48 of Planning Permission Ref. NP/HPK/0403/037Lafarge Cement Hope Works HopeReceived 18 Aug 2026ConditionsNP/DIS/0826/08162.7 km from centrePeak District council
- ApprovedGDO Notiifcation - Roof over existing solid farmyard manure storage area and associated concrete yard and drainage improvements.Bridge End Farm HartingtonReceived 17 Aug 2026Decided 09 Sept 2026OutlineNP/GDO/0826/08114.66 km from centrePeak District council
- WithdrawnLawful Development Certificate for an existing use -E(b) - Sale of food and drink for consumption mostly on the premises.The Old Smithy Tea Rooms The Square MonyashReceived 16 Aug 2026AmendmentNP/DDD/0826/07774.1 km from centrePeak District council
- PendingInstallation of an additional hydrate plantBRIERLOW QUARRY , Brierlow Bar , Buxton , Derbyshire , SK17 0ELReceived 26 Jul 2026OutlineCON/2026/00734.44 km from centreHigh Peak council
- ApprovedDemolition of existing side garage and construction of new two storey side extension and associated single storey rear lean-to.Branksome Unnamed Road From Buxton Road To Main Road Earl SterndaleReceived 26 Jul 2026Decided 07 Sept 2026FullNP/DDD/0726/07372.75 km from centrePeak District council
- ApprovedProposed extension to dwellingIngatestone House Chapel Street MonyashReceived 26 Jul 2026Decided 11 Oct 2026FullNP/DDD/0726/07404.19 km from centrePeak District council
- UnknownMature Ash requires thinning professionally. Constant shedding, 14 metres from house.Ash Barn Church Street Monyash Nr Bakewell DE45 1JHReceived 22 Jul 2026TreesNP/TCA/0726/07284.22 km from centrePeak District council
- RefusedDemolition of the existing detached garage/outbuilding and construction of a replacement ancillary annex within the residential curtilage of the dwelling to provide accommodation for a dependent family member.2 Church Lane MonyashReceived 08 Jul 2026Decided 20 Aug 2026FullNP/DDD/0726/06514.14 km from centrePeak District council
- UnknownSurveyed by Joe Bawden (PDNPA Tree Officer) on 4 Jun 2026 Species: Birch, Downy Age class: Mature Height: 15m DBH: 50cm Birch Tree next to Lower Wiggenstall Farm homestead and carparking area (used to store machinery). Please see map attached. Advice is to fell tree as it will land on expensive farm machinery when it fails. Issue: Large cavity on S side arising from large pruning cut. Probe and mallet confirm decay is localised at present. Similar 2025 and 2026. Active early cracks following reactive helical growth at 1m on opposite side to the cavity 2026. Works Fell the tree ASAP (within 13 weeks of approval).Lower Wiggenstall Farm, New Road, Longnor, SK17 0LJReceived 30 Jun 2026TreesNP26/06564.89 km from centrePeak District council
- ApprovedGDO Notification - Proposed agricultural storage building.Gauledge Farm Gauledge Lane LongnorReceived 28 Jun 2026Decided 05 Jul 2026OutlineNP/GDO/0626/06322.59 km from centrePeak District council
- ApprovedChange of use of existing staff welfare accommodation to holiday let accommodation.The Barn Longnor Wood Holiday Park NewtownReceived 19 May 2026Decided 08 Jul 2026FullNP/SM/0526/04734.19 km from centrePeak District council
- Approved with conditionsDischarge of conditions 4, 5, 12, 13, 14 and 15 on NP/SM/0125/0051.Hall Hill Fawfield Head LongnorReceived 10 May 2026Decided 04 Aug 2026ConditionsNP/DIS/0526/04664.52 km from centrePeak District council
- PendingConversion of existing buildings to additional holiday let accommodation and games roomWheeldon Trees Farm Holiday Cottages Unnamed Section Of C138 From Crowdicote Road To Tagg Lane Earl SterndaleReceived 19 Apr 2026FullNP/DDD/0426/03691.1 km from centrePeak District council
- ApprovedT1- Ash tree to undergo a 30% crown thin to reduce the branches through the tree.Ivy House, Church Street, Monyash, Bakewell, DE45 1JHReceived 24 Mar 2026Decided 26 Mar 2026TreesNP/TCA/0326/03024.25 km from centrePeak District council
- ApprovedChange of use of traditional former agricultural barn to single residential dwelling with associated access, garden, parking and package treatment plant.Keelings Barn Fawfieldhead LongnorReceived 02 Mar 2026Decided 06 Sept 2026FullNP/SM/0226/01803.95 km from centrePeak District council
- ApprovedRetention of new access track onto the main road (A515) and proposed construction of a new track off the existing track to BeechcroftBEECHCROFT , GREAT LOW FARM , Unnamed Road Section Of A515 From Brierlow Bar To District Boundary , Flagg , Derbyshire , SK17 9QEReceived 19 Feb 2026Decided 05 Aug 2026FullHPK/2026/00842.57 km from centreHigh Peak council
- PendingReplacement of existing stables/storage building and construction of a new outbuilding to form domestic annexeGag Aye Farm , Carr Lane , Longnor , Staffordshire , SK17 0RJReceived 19 Feb 2026OutlineCON/2026/00233.12 km from centreStaffordshire Moorlands council
- ApprovedApplication to Pollard a Lime tree.St Leonards Church Yard Church Street Monyash Bakewell DE45 1JHReceived 14 Jan 2026Decided 29 Jan 2026TreesNP/TCA/0126/00414.25 km from centrePeak District council
- ApprovedTo prune all shrubs situated in the raised bed to the left of the village hall (looking at the building from the road), down to approximately the height of the existing boundary stone wall. From the roadside wall to the gas tank towards the rear of the property. Each shrub will be pruned to their individual requirement, thus heights may vary slightly with each other. • To fell to ground level 2 x Ash tree suckers growing from old stumps. Stumps to be treated with herbicide to prevent regrowth. • Mature Sycamore tree situated at the opposite end of the hall and against Cheney Lodge to be crown lifted reducing the overhanging canopy to the hall, storage shed below and the neighbouring driveway and fuel tank.Monyash Village Hall Church Street Monyash DE45 1JHReceived 13 Jan 2026Decided 15 Jan 2026TreesNP/TCA/0126/00324.25 km from centrePeak District council
- WithdrawnRetrospective application for a new access onto the main road (A515) and construction of a new track off the existing track to the existing BungalowGreat Low Farm , Unnamed Road Section Of A515 From Brierlow Bar To District Boundary , Flagg , Derbyshire , SK17 9QEReceived 17 Dec 2025Decided 19 Jan 2026FullHPK/2025/04952.57 km from centreHigh Peak council
- UnknownTo reduce the canopy of a plum tree - for the health of the tree and to improving fruiting, also to make it more manageable To reduce the canopy of an apple tree - as per the plum tree To remove a line of Elders which abutt, and are damaging the drystone wall (western) boundary between our property and the neighbouring field. To reduce the canopy of an Elder on the eastern boundary of our property. To reduce an Elder at the southern end of our property. To reduce the height and depth of a Hawthorn on the eastern boundary of our property.The Croft Church Street Monyash DE45 1JHReceived 20 Nov 2025TreesNP/TCA/1125/11694.29 km from centrePeak District council
Showing the 40 most recent of 40 within 5 km. Planning data from PlanIt, updated nightly. For older or narrowly defined applications, consult the council portal directly.