←Back to overview
Planning · Achinduich
Planning applications near Achinduich
10 applications in the last 12 months within 5 km. Data aggregated from the local planning authority by planit.org.uk.
Last 30 days
0
Last 12 months
10
Pending
3
Approved
7
PendingApprovedRefusedWithdrawnOtherCentre of Achinduich
- PendingConstruction and operation of a 132 kilovolt (kV) underground cable, approximately 5.79 km in length, between the proposed Garvary Wind Farm substation and the existing Loch Buidhe substation, south of Lairg, Scottish Highlands. Associated works comprise works within the operational footprint of Loch Buidhe substation to facilitate the new 132 kV connection, construction of temporary access tracks and/or upgrade to existing tracks, temporary construction compound, and reinstatement of underground cable construction corridor.Land 1.25 KM SW Of Garvary Bonar BridgeReceived 08 Sept 202626/03962/PAN3.05 km from centreHighland council
- PendingConstruction of 300m Forest RoadLand 860M West Of Carbisdale Castle ArdgayReceived 01 Sept 2026Full26/03826/FUL4.59 km from centreHighland council
- ApprovedConstruction of forestry road (Class 22)Land 860M West Of Carbisdale Castle ArdgayReceived 06 Aug 2026Decided 02 Sept 2026Outline26/03393/PNO4.61 km from centreHighland council
- ApprovedErection of garageInverhouse Culrain Ardgay IV24 3DPReceived 19 Jul 2026Decided 07 Oct 2026Full26/03094/FUL3.71 km from centreHighland council
- ApprovedGarvary II Wind Farm - Erection and operation of a wind farm for a period of 40 years, comprising up to 16 wind turbines with a maximum blade tip height of 200m, access tracks, borrow pits, substation, control building, and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00006340Land 1730M SE Of Haradwaith LairgReceived 18 Mar 2026Decided 14 May 2026Outline26/01246/SCOP2.99 km from centreHighland council
- ApprovedEIA Scoping Request for the construction and operation of a new 132kV overhead line (OHL) connection between Shin Substation and a proposed cable sealing end (CSE) compound approximately 2 km west of Loch Buidhe Substation, and the dismantling of the existing 132kV OHL connection between Shin Substation and Loch Buidhe SubstationLand 2430M SW Of Loch Buidhe Bonar BridgeReceived 10 Feb 2026Decided 31 Mar 2026Outline26/00739/SCOP2.44 km from centreHighland council
- ApprovedConstruction of quad tracks (Class 22)Land 385M NW Of Milton Cottage Gruids LairgReceived 09 Feb 2026Decided 06 Mar 2026Outline26/00530/PNO3.18 km from centreHighland council
- PendingShin to Loch Buidhe 132 kV Overhead Line RebuildLand 2700M SE Of Haradwaith LairgReceived 08 Jan 202626/00076/PAN2.83 km from centreHighland council
- ApprovedErection of a house for holiday letting purposesLand 220M NW Of Carbisdale Castle ArdgayReceived 05 Nov 2025Decided 29 Sept 2026Full25/04198/FUL4.34 km from centreHighland council
- ApprovedFormation of temporary worker accommodation village comprising modular buildings, including living accommodation (c.150 beds), welfare and recreation uses, formation of access, parking and associated works.Land To The North Of Achinduich LairgReceived 31 Oct 2025Decided 20 Nov 2025Outline25/04180/SCRE1.64 km from centreHighland council
Showing the 10 most recent of 10 within 5 km. Planning data from PlanIt, updated nightly. For older or narrowly defined applications, consult the council portal directly.